A little rain and some better temperatures and the course is coming alive. Everything needs cut now and bunkers are getting close to being ready to open.
The recovery on the fairways is coming along well. We have seen all areas reduced and some fully recovered. We have been doing a mixture of venting (with a machine or by hand), overseeding, extra watering, and increased fertilization. The bentgrass on the fairway grows laterally and is filling in smaller areas. August is a perfect month for seed to finish growing in these areas, with cooler nights and reasonable temperature days recovery will continue.

Comments
Post a Comment